Main Switchgear Panel B
Electrical Panel, Mechanical Room 2
Pass
Unchecked
Fail
Severity
None
Class 1
Class 2
Class 3
Class 4
Measurements
Ambient temp (°f)
Target temp (°f)
Relative humidity
Zoom
Emittance
IR Images
Add IR Image
Issues & Notes
Issue code
1 - For future reference only - no problem. Continue to monitor annually.
2 - Continue to monitor annually.
3 - Have all switchgear serviced by switchgear specialist on two-year interval.
4 - Clean and re-torque connections.
5 - Replace defective breaker.
6 - Replace defective knife blade assembly.
7 - Replace defective components.
8 - Re-crimp or replace lug / connector.
9 - Replace fuse and fuse clip.
10 - Replace fuse and re-tension fuse clip. Clean and re-torque connections.
11 - Replace fuse and re-tension fuse clip. Consider installing fuse clip clamps.
12 - Inspect fuse clips for damage / verify proper seating.
13 - Consider installing fuse clip clamp.
14 - Upgrade circuit breakers and wiring or redistribute load to reduce amperage.
15 - Redistribute load to reduce amperage.
16 - Rewire using one circuit per breaker.
17 - Rework splices.
18 - Vacuum excess dust and debris.
19 - Remove dead circuits.
20 - Provide minimum three feet of access clearance.
21 - Install cover over penetrations / openings.
22 - Number of circuits exceeds intended design. Install additional panel and relocate extra circuits.
Notes
Inspection