Inspection #10 - Dell - 2025-10-23
Equipment
-
Main Switchgear Panel A
Mechanical Room 1, Austin
- -
Main Switchgear Panel B
Mechanical Room 2, Austin
- -
Lighting Distribution Panel 1
Hallway A, Austin
- -
Lighting Distribution Panel 2
Hallway B, Austin
- -
Motor Control Center 1
Boiler Room, Austin
- -
Motor Control Center 2
Compressor Room, Austin
- -
HVAC Air Handler Unit 1
Roof Deck East, Austin
- -
HVAC Air Handler Unit 2
Roof Deck West, Austin
- -
Main Transformer T1
Outside North Pad, Austin
- -
Main Transformer T2
Outside South Pad, Austin
- -
Breaker Panel L1
Warehouse Wall A, Austin
- -
Breaker Panel L2
Warehouse Wall B, Austin
- -
Condenser Unit C1
Roof Zone A, Austin
- -
Condenser Unit C2
Roof Zone B, Austin
- -
Main Pump P1
Basement Pump Room, Austin
- -
Main Pump P2
Basement Pump Room, Austin
- -
Server Rack Power Strip 1
Data Room A, Austin
- -
Server Rack Power Strip 2
Data Room B, Austin
- -
Elevator Control Panel
Elevator Shaft Room, Austin
- -
Fire Pump Controller
Fire Control Room, Austin
-
Technicians
-
Homer Simpson
-
Gob Bluth
-
Chris Ray