Inspection #7 - TCU - 2025-10-23
Equipment
-
Main Switchgear Panel A
Mechanical Room 1, Tucker
- -
Main Switchgear Panel B
Mechanical Room 2, Tucker
- -
Lighting Distribution Panel 1
Hallway A, Tucker
- -
Lighting Distribution Panel 2
Hallway B, Tucker
- -
Motor Control Center 1
Boiler Room, Tucker
- -
Motor Control Center 2
Compressor Room, Tucker
- -
HVAC Air Handler Unit 1
Roof Deck East, Tucker
- -
HVAC Air Handler Unit 2
Roof Deck West, Tucker
- -
Main Transformer T1
Outside North Pad, Tucker
- -
Main Transformer T2
Outside South Pad, Tucker
- -
Breaker Panel L1
Warehouse Wall A, Tucker
- -
Breaker Panel L2
Warehouse Wall B, Tucker
- -
Condenser Unit C1
Roof Zone A, Tucker
- -
Condenser Unit C2
Roof Zone B, Tucker
- -
Main Pump P1
Basement Pump Room, Tucker
- -
Main Pump P2
Basement Pump Room, Tucker
- -
Server Rack Power Strip 1
Data Room A, Tucker
- -
Server Rack Power Strip 2
Data Room B, Tucker
- -
Elevator Control Panel
Elevator Shaft Room, Tucker
- -
Fire Pump Controller
Fire Control Room, Tucker
-
Technicians
-
Brian Wigginton